In early October, we completed the run of The Monkey's Paw and Other Stories at The Archway Theatre in Horley. It was an eerie, moving production telling stories of tragedies that have happened around the area.
Across four performances over three days, the production brought together several different technical disciplines, with lighting, sound, video, radio communications, control room systems and supporting IT infrastructure all playing a part.
For me, it was the biggest technical undertaking I've worked on so far. Taking responsibility for so many different aspects of the production meant that this was about considerably more than operating lights and sound during a performance. It involved planning systems, preparing equipment, building infrastructure, developing procedures and making sure everything worked together as part of one overall operation.
The production took place across multiple spaces within The Archway Theatre, creating a number of technical and operational considerations.
Preparation began well ahead of the performances, with equipment and systems being planned and assembled before the main rigging period. Around two weeks were dedicated to building and preparing the technical setup, within a three-week preparation period.
My role covered the technical operation of the production, bringing together the different systems and making sure they were ready for the performances.
The main areas of responsibility included:
Lighting design and operation
Sound engineering and operation
Video and presentation systems
Radio communications
Control room and computer systems
Technical infrastructure and networking
Operational procedures and contingency planning
Each area had its own requirements, but the real challenge was making sure they all worked together.
Lighting and sound were two of the central parts of the production.
The lighting setup involved designing and preparing the lighting systems for the performances, ensuring that the equipment, programming and operation were all ready for the show.
Alongside this, sound engineering involved preparing the audio systems and ensuring that the necessary equipment and signal paths were in place.
Both disciplines required more than simply getting equipment working. The systems needed to be practical to operate, reliable throughout the performances and properly integrated into the wider technical setup.
One of the more interesting aspects of the project was the use of computer systems to support the production.
Rather than treating computers as an afterthought, they formed part of the wider technical infrastructure.
Multiple PCs were planned into the setup, supporting different control and monitoring requirements across the production spaces, alongside additional capacity for resilience.
The control systems also brought together lighting, sound and video operation, helping to make the technical side of the production more manageable.
This was an opportunity to apply some of my IT experience in a live production environment, particularly around system configuration, infrastructure and making different technologies work together.
Communications were another particularly important part of the project.
With activity taking place across multiple spaces, having a reliable way for the team to communicate was essential.
I took responsibility for the event radio arrangements, including preparing the equipment and establishing the procedures for its use.
This was especially important because the venue's existing fire alarm call points were out of use for this production. Radio communications therefore formed an important part of the arrangements for coordinating staff and communicating during an emergency, including an evacuation.
It was a great example of how communications equipment is about more than simply being able to talk to someone. The equipment, procedures and people using it all need to work together.
Behind the individual technical systems was the infrastructure needed to support the overall operation.
The production required consideration of where equipment would be located, how systems would be controlled and how information could be shared between the different spaces.
The control arrangements had to account for the practicalities of the venue, including equipment locations, operator access, sightlines and communication requirements.
This meant balancing what would be technically convenient with what would actually work during a live performance.
Computer systems, monitoring arrangements and the wider production infrastructure all formed part of this planning.
It was important that the setup was not only functional, but also manageable for the people operating it.
A significant amount of the work took place before the audience arrived.
There were systems to test, equipment to prepare, procedures to establish and contingencies to consider.
With so many different elements involved, it was important to think about what could go wrong and how the team would respond.
That included considering how people would communicate, how technical issues could be identified and dealt with, and how the production could continue if something did not work as expected.
In a live environment, discovering a problem during a performance is very different from discovering it during preparation.
Testing and planning therefore played a major part in getting the production ready.
One of the biggest challenges of a project like this is that none of the technical disciplines operates entirely in isolation.
Lighting, sound, video, communications and IT infrastructure all have their own requirements, but they also depend on one another.
A computer system might support several different functions. A communications issue could affect the wider operation. A change to the physical setup could have implications for equipment locations or operator access.
The challenge was to bring all of these elements together into something that was practical, reliable and suitable for the production.
Across the four performances, all of that preparation finally came together.
The Monkey's Paw and Other Stories was a particularly valuable project for me because it brought together so many areas of my experience.
It gave me the opportunity to work across technical theatre, live event operations, IT infrastructure and communications, while taking responsibility for a much wider technical setup than I've previously managed.
It also reinforced something I enjoy about this kind of work: the technical side of an event is not just about individual pieces of equipment. It's about the systems, people and processes that allow everything to happen as it should.
I'm pleased with what we were able to put together, and grateful to everyone involved in making the production happen.
It was a significant undertaking, a lot of work, and a very rewarding project to be part of.